CNC EDM SGS Window End Cap , LKM Plastic Parts Mold Injection Mould And Molding
Product Details:
Place of Origin: | Dongguan,China |
Brand Name: | OEM |
Certification: | SGS |
Model Number: | PP Injection Moulding |
Payment & Shipping Terms:
Minimum Order Quantity: | 500 |
---|---|
Price: | Negotiable |
Packaging Details: | PE Plastic Packaged in Carton |
Delivery Time: | 30 workdays |
Payment Terms: | T/T, D/A, L/C, D/P, Western Union, MoneyGram |
Supply Ability: | 3000pcs/per day |
Detail Information |
|||
Product Material: | PP | Shaping Mode: | Injection Mould |
---|---|---|---|
Surface Treatment: | Texture | Size: | 70*53*66.5mm |
Color: | Black | Mould Base: | LKM |
Highlight: | CNC EDM Window End Cap,SGS Window End Cap,LKM Plastic Parts Mold |
Product Description
Window Frame End Cap Left Injection Molding Components Mold Plastic Parts
Name | Window Frame End Cap Left Injection Molding Components Mold Plastic Parts |
Core Material | High hardness alloy steel with heat treatment, wear resistance, corrosion resistance |
Plastic Material | PP |
Mold Equipment | CNC, EDM, precision grinder, milling machine, driller, wire |
Products Color | Black |
Application Area | PP Injection Moulding |
QC Equipment | Quick checking tools |
Delivery Time | 4-8 weekends |
Package Method | Mold by wooden box, products by carton. As you required |
Export Port | Shenzhen port |
About us
we produced plastic parts and mould over 23 years,have worked with many europe countries and east asia countries,
Why choose us?
1,we have bussiness with our credits in this field been 23 years
2,best facilities to produce quality products
3,we offer you service in 24/7
4,lead time is timely
5,last but not the least,factory price with quality products
FAQ
Q: What industries do your products mainly cover?
A: In the past 20 years, we have developed and manufactured moulds including electronic products, furniture, lighting products, daily necessities, medical equipment, engineering equipment, etc.
A:Our lead time is around 25-30 workdays,and the delivery time is around 7-14 days.