SGS Window Sill End Caps Molding , LKM CNC EDM Custom Plastic Pieces Mould
Product Details:
Place of Origin: | Dongguan,China |
Brand Name: | OEM |
Certification: | SGS |
Model Number: | Plastic Injection Molded Parts |
Payment & Shipping Terms:
Minimum Order Quantity: | 500 |
---|---|
Price: | Negotiable |
Packaging Details: | PE Plastic Packaged in Carton |
Delivery Time: | 30 workdays |
Payment Terms: | T/T, D/A, L/C, D/P, Western Union, MoneyGram |
Supply Ability: | 3000pcs/per day |
Detail Information |
|||
Product Material: | PP | Shaping Mode: | Injection Mould |
---|---|---|---|
Surface Treatment: | Texture | Size: | 70*53*66.5mm |
Color: | Black | Mould Base: | LKM |
Highlight: | SGS Window Sill End Caps,CNC EDM Custom Plastic Pieces,LKM Custom Plastic Pieces |
Product Description
Window Frame End Cap Right Injection Molding Custom Molded Plastic Parts
Name | Window Frame End Cap Right Injection Molding Custom Molded Plastic Parts |
Core Material | High hardness alloy steel with heat treatment, wear resistance, corrosion resistance |
Plastic Material | PP |
Weight | 8g |
Mold Equipment | CNC, EDM, precision grinder, milling machine, driller, wire |
Products Color | Black |
Mould Precision | +/-0.05mm |
Mould Life | 300k shots/5 years |
Application Area | Plastic Injection Molded Parts |
QC Equipment | Quick checking tools |
Delivery Time | 4-8 weekends |
Package Method | Mold by wooden box, products by carton. As you required |
Export Port | Shenzhen port |
About us
As a company establised at Dongguan,China over 23 years,we are specialized in reseaching and making plastic mould,we hired around 100 people as a team to work for our clients.
we worked with many enterprices all around the world,europe,north america,east asia,middle east,etc.
FAQ
Q: What industries do your products mainly cover?
A: In the past 20 years, we have developed and manufactured moulds including electronic products, furniture, lighting products, daily necessities, medical equipment, engineering equipment, etc.
Q:What do you ensure the product quality?
A:We follow all the process after the products were get deliverd to customers,before that,our manager and QC would check the quality.
Q:How to deal with the faulty?
A: If the quality problems were caused by producing,we will take the responsibility and arrange our worker to reproduce your products.
Q:How long does the delivery take to get?
A:Almost 7-14 days.