SGS Anticorrosive Industrial Moulded Products Plastic Guide Plate LKM Mould And Mold Maker
Product Details:
Place of Origin: | Dongguan,China |
Brand Name: | OEM |
Certification: | SGS |
Model Number: | Industrial Moulded Products |
Payment & Shipping Terms:
Minimum Order Quantity: | 500 |
---|---|
Price: | Negotiable |
Packaging Details: | PE Plastic Packaged in Carton |
Delivery Time: | 30 workdays |
Payment Terms: | T/T, D/A, L/C, D/P, Western Union, MoneyGram |
Supply Ability: | 3000pcs/per day |
Detail Information |
|||
Product Material: | ABS+PC | Shaping Mode: | Injection Mould |
---|---|---|---|
Surface Treatment: | Texture | Size: | 109*45*6.5mm |
Color: | Orange | Mould Base: | LKM |
Highlight: | Anticorrosive Industrial Moulded Products,SGS Industrial Moulded Products,LKM Plastic Guide |
Product Description
Plastic Guide Plate of Construction Testing Instruments Custom Industrial Products
Name | Plastic Guide Plate of Construction Testing Instruments Custom Industrial Products |
Core Material | High hardness alloy steel with heat treatment, wear resistance, corrosion resistance |
Plastic Material | ABS |
Mold Equipment | CNC, EDM, precision grinder, milling machine, driller, wire |
Products Color | Orange |
Weight | 3.5g |
Mould Life | 100k-200k shots/2 years |
Mould Precision | +/-0.05mm |
Application Area | Industrial Moulded Products |
QC Equipment | Quick checking tools |
Delivery Time | 4-8 weekends |
Package Method | Mold by wooden box, products by carton. As you required |
Export Port | Shenzhen port |
Why choose us?
1,we are a reliable supplier in this field for 23 years
2,to work better with our clients we upgraded our facilities
3,we offer you service in 24/7
3,most of our goods are qualified
4,Shiping on time,don't worry about the delivery
5,last but not the least,we can give you a factory price with quality products
FAQ
Q: What do your products coverd?
A: We can produce kinds of plastic parts,like,medical plastic parts,electronic plastic parts,transparent plastic parts,etc.
Q:Which kind of delivery way you choose?
A:DHL,Fedex,etc,depends on clients need
Q:How long should be wait to get products?
A:The producing period add the delivery period,it'll take 40 days to get your products.