Curtain Track Guide Piece Plastic Right Parts Plastic Injection Molded Parts Molding And Mold Making
Product Details:
Place of Origin: | Dongguan,China |
Brand Name: | OEM |
Certification: | SGS |
Model Number: | Plastic Injection Molded Parts |
Payment & Shipping Terms:
Minimum Order Quantity: | 500 |
---|---|
Price: | Negotiable |
Packaging Details: | PE Plastic Packaged in Carton |
Delivery Time: | 30 workdays |
Payment Terms: | T/T, D/A, L/C, D/P, Western Union, MoneyGram |
Supply Ability: | 3000pcs/per day |
Detail Information |
|||
Product Material: | POM | Shaping Mode: | Injection Mould |
---|---|---|---|
Surface Treatment: | Texture | Color: | Grey |
Product Description
Curtain Track Guide Piece Plastic Right Parts Plastic Injection Molded Parts
Name | Curtain Track Guide Piece Plastic Right Parts Plastic Injection Molded Parts |
Core Material | High hardness alloy steel with heat treatment, wear resistance, corrosion resistance |
Plastic Material | POM |
Mould Weight | 3g |
Mould Life | 200k-500k shots/2 years |
Mould Precision | +/-0.05mm |
Mold Equipment | CNC, EDM, precision grinder, milling machine, driller, wire |
Products Color | Grey |
Application Area | Plastic Injection Molded Parts |
QC Equipment | Quick checking tools |
Delivery Time | 4-8 weekends |
Package Method | Mold by wooden box, products by carton. As you required |
Export Port | Shenzhen port |
Our introduction
As a medium mould and plastic parts customized company,we work out products and plastic parts over 23 years,we have produced medical plastic parts,electronic plastic parts,plastic home appliance parts,etc.we have lots of plastic experiences,we cooperated with many international enterprices,we can deal with different case from different countries.nowadays,we have 90 employees and plenty first-rate-facilites to produce plastic parts and mould for clients.
FAQ
What about the lead time?
A: 3-5 days for Sample preparing ,25-30 working days for mass production.
How do you ship the goods and how long does it take to arrive?
A: Ship by DHL, UPS, FedEx or TNT. It takes10 days around to arrive. Airline and sea shipping also optional.
How to deal with the faulty?
A: Firstly, Our products are produced in strict quality control system.but if the products were found out quality problem,we will take the responsibility and arrange our worker to reproduce your products.