New Energy Automotive Heater Plastic Injection Mouldings Single Cavity Top Cover PA66 Mold Direct Runner Two Plate Mold
Product Details:
Place of Origin: | dongguan,china |
Brand Name: | OEM |
Certification: | SGS |
Model Number: | Automotive Plastic Injection Mouldings |
Payment & Shipping Terms:
Minimum Order Quantity: | 500 |
---|---|
Price: | Negotiable |
Packaging Details: | Carton(61*29*47cm) |
Delivery Time: | 25days |
Payment Terms: | T/T |
Supply Ability: | 700pics/per day |
Detail Information |
|||
Material: | PA66+GF | Shaping Mode: | Injection Mould |
---|---|---|---|
Application: | Car | Mould Cavity: | Single Cavity |
Color: | Blue | Lifetime: | 5 Years |
Highlight: | 0.05mm Automotive Plastic Injection Mouldings,PA66 Automotive Plastic Injection Mouldings,PA66 Single Cavity Top Cover |
Product Description
New Energy Vehicles Battery Blue Heater Box Top Cover Plastic Injection Mould Tooling
Specifications:
Name | New Energy Vehicles Battery Blue Heater Box Top Cover Plastic Injection Mould Tooling |
Material | PA66+GF |
Dimension |
Customized |
application | car battery |
Working Temperature |
-20~200℃ |
Surface Treatment | sandy finish |
Housing Color |
Black/Blue |
Standard |
LKM |
Weight | 510g |
Mould Precision | +/-0.05mm |
Certificate | ISO |
package |
Carton(61*29*47cm) |
Production Capacity | 5000/month |
Life span |
500000/2yrs |
Origin | dongguan china |
Feature Of Plastic Injection Mold
- Plastic injection mold
- cover or Lid parts
- PP material
- 1*4 injection mold
- H13 (HRC48-52) Steel
- YUDO Hot runner
- Full hot runner
- Automatically running
- HASCO standard
- Short cycle time
1, Start from part design analysis.
2, Mold design drawing and DFM report available so you can see how is the mold going to be before mold making.
3, If product is complex, moldflow report will be present as well.
4, In house mold making shop ensure you mold quality under well control.
5, Normally it takes 20-40 days to make mold, precise time depends on part design.
FAQ
Q:What is your company superiority?
A:First,we have 23 years plastic mould and parts customized experiences,Second,we have efficiency with 90 personnel and first-rate-facilities.Third,our staff would treat all customer welcoming,Fourth we can make plastic parts that other companies might not to make.Fifth,our price is favorable.
Q:How is your efficiency?
A:We need 30 days around to make plastic parts and mould,and need 7 days around to send the products to you.