HMW HDPE Plastic Injection Mold Components High Molecular Weight
Product Details:
Place of Origin: | dongguan,China |
Brand Name: | CHENGKANG |
Certification: | SGS |
Model Number: | KC205 |
Payment & Shipping Terms:
Minimum Order Quantity: | 1000 |
---|---|
Price: | 3.3-4 |
Packaging Details: | PE bag +Cartons |
Payment Terms: | T/T |
Supply Ability: | 500sets/day |
Detail Information |
|||
Highlight: | HMW Plastic Injection Mold Components,HDPE Plastic Injection Mold Components,HDPE Injection Plastic Parts |
---|
Product Description
Japan HMW-HDPE High Molecular Weight Polyethylene Rolling Barrel Wear Resistance Coefficient of Low Shock Absorption
Plastic Mold (Moulds) production process |
Description |
1. 3D Design/Samples for quotation | According to 3D drawing or samples for quotation. |
2. Negotiations |
Including the price of molds, molds sizes, material for cores & cavities, weight of product, part cost, payment, mold lifetime, delivery, etc. |
3. Purchasing Order | After the customer confirming the mold design and quotation. |
4. Making mold(moulds) |
Confirm drawing, start to do DFM, mold flows and mold detail agreed with the customer, start production. |
5. Production schedule | Every week we will feedback to the customer a mold progress(picture). |
6. sample shoot |
We provide the molds test samples for confirmation (about 10-15 piece), then, get your signature sample, mass production. |
7. Package | Wooden case for moulds, cartons for parts, or as your requirement. |
8. Delivery | deliver goods by air or by sea. |
Feature Of Plastic Injection Mold
- Plastic injection mold
- cover or Lid parts
- PP material
- 1*4 injection mold
- H13 (HRC48-52) Steel
- YUDO Hot runner
- Full hot runner
- Automatically running
- HASCO standard
- Short cycle time
1, Start from part design analysis.
2, Mold design drawing and DFM report available so you can see how is the mold going to be before mold making.
3, If product is complex, moldflow report will be present as well.
4, In house mold making shop ensure you mold quality under well control.
5, Normally it takes 20-40 days to make mold, precise time depends on part design.
Recently, the customer CJ encountered that the rolling barrel produced by them was not wear-resistant. When he got the sample, he preliminarily determined that it was PE material based on my knowledge. The pipe for conveying ore sand in the mine made of PE material in the state-owned factory was PE. Considering the customer's emphasis on wear resistance. I think the wear-resistant component is the molecular weight PE (actually I have not used this material, just knowledge accumulation). I will immediately find the supplier to find the material for mold test and sample making. Send it to the customer for a try. It is similar to the sample imported by foreigners. The guests were happy, too. As soon as the problem that had weighed on his mind for years was solved, he ordered 1,000 sets.